Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ubgp4r/cur007-01.brethummel.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the responsive-lightbox-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ubgp4r/cur007-01.brethummel.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ubgp4r/cur007-01.brethummel.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ubgp4r/cur007-01.brethummel.com/wp-includes/functions.php on line 6131
Bringing Utilities to an Accessory Dwelling Unit By Digging a Trench

South Minneapolis ADU

Building a Garage Apartment in South Minneapolis

Follow along as we build an Accessory Dwelling Unit (ADU) above a new garage in South Minneapolis.

Trench

We are prepping to bring utilities to the new structure from the house by digging a trench through the yard.

Trench for Plumbing and Internet

We are digging the plumbing and internet cable trench; the electrical will run overhead. After pressure testing and inspection top will be covered with 6-8″ of sand. It is important to take a picture for the inspector. Then cover with 3″ rigid insulation, and finally backfill. Even though we are technically below the frost line of 42″ for our climate zone the 3″ rigid foam on the sides and the top of the plumbing add additional thermal protection and are required by code.

A trench is dug to connect plumbing and internet from the house to the new ADU.

We have roughed in the plumbing access to the house. We will not break all the way through until after the holiday when we are further along with our new structure. This will minimize the disruption to the family.

 

In January, we’ll bore an 8″-10″ access to the lower level of the home. When we bore into the house a temporary dust protection will be set up and the opening will be insulated until we are ready to tie into the house’s plumbing and internet. Electrical will run overhead.

We drill into the block to tie in plumbing and internet through the trench from the house to the ADU.

Buried treasure! Buried treasure! We unearthed a vintage perfume bottle while digging the utilities trench in the yard at this 1931 South Minneapolis Home.